February 2009

Link to the start up / transition procedure schedule.

Permeate and Air piping, the final effluent is removed through the gray piping.


The UV system: Once the permeate is removed from the membranes it flows through the UV system then into Mill Creek or up to the Irrigation site in the summer.


The head works: Inffuent is dilivered from Webb Ave lift station into this box. The box contains two 2mm bar screens and a screw that delivers plastics and outher foriegn objects out of the waste stream and into a trash can. The remaing stream is then dilivered into the Anoxic zone before the membranes.


The following three photos show the arrival and unloading of the membranes.






Link back to January photos